Scheduling desk / Offline tool
Crew Clash
Spot double-booked crew before the call sheet goes out. Check a roster for overlapping bookings, even when projects use different time zones.
Get Crew Clash · $191. Load your roster
Free limit: 15 bookings, excluding the CSV header. Upgrade for more · $19
CSV format and limits
- Paste a comma- or semicolon-delimited export. Review the five column choices. Extra columns are ignored.
- Use a unique booking ID per crew member. Crew, booking and project cannot be blank. Wrap fields containing commas or line breaks in double quotes; double a quote inside a quoted field.
- Use local dates and times such as
2026-11-25 09:30in the project time zone, or include an explicit offset such as2026-11-25T09:30:00+01:00. For repeated clock times supply the intended offset. Correct skipped clock times against the schedule. - Use a UTF-8 CSV file up to 1 MiB.
2. Review overlaps
Each pair shares a crew ID. Times below are in UTC. One shift ending exactly when another begins is not a clash.
No roster checked yet.
| crew_id | booking_a | project_a | booking_b | project_b | overlap_start_utc | overlap_end_utc |
|---|